Client: Corangamite Shire Council

Demolition of existing boat ramp, piles and pontoons. Earthworks including dredging of lakebed and placement of imported rock. Construction of precast concrete boat ramp with articulated concrete matting. Construction of precast concrete retaining wall with H piles. Design and construction of pontoon piles, 17m pontoon and 7m gangway. The pontoons and gangways were supplied by Bellingham Marine.

Leave a Reply

Your email address will not be published. Required fields are marked *