Client: Parks Victoria

Demolition of two fire damaged jetties. Design and construction of two 12m long jetty abutment, two 10m gangways and two 9m floating concrete pontoons. The pontoons and gangways were supplied by Bellingham Marine.

Leave a Reply

Your email address will not be published. Required fields are marked *